Services / Flooring
Flooring
LVT and laminate over a subfloor that has been levelled first, because a dip in the screed telegraphs straight through within a year.
Subfloor levelled to 2mm · LVT and laminate
Thresholds and trims fitted · Cheddar and half an hour round it

Most flooring that fails did so before a single plank was laid. The floor under it was not flat, and the covering has spent a year finding that out.
So the subfloor gets checked and levelled first, and the covering goes down on something it can stay flat on.
Often booked alongside
Tell me about the floor
Quotes are free, in writing, and fixed. Ring during the day or send the form and I will come back the same evening.
