Fergus Interiors
Call07399 201558

Recent work

Photographs from my own phone, taken as the job went along. Most of them are the middle of the work rather than the tidy end of it, because the middle is the part you are paying for and the part nobody else shows you.

All 4Studwork & dry liningFire doorsCarpentryFlooring
Loft conversion, framed and boarded

Studwork & dry lining

Loft conversion, framed and boarded

Two weeks of framing under the rafters and then boarding out. The gable was blockwork on one side and old brick on the other, so the linings were packed out to meet in a single flat plane rather than following what was there.

Timber studwork · insulated · boarded and taped
4 photographs

Curved bar counter, commercial fit-out

Carpentry

Curved bar counter, commercial fit-out

Framed and clad in a long continuous curve, then tiled. The radius was set out full size on the floor first, so the front came round in one line instead of a series of flats pretending to be a curve.

Curved carcass · tiled front · worktop to follow
5 photographs

Door sets with vision panels

Fire doors

Door sets with vision panels

Sets hung and vision panels fitted square to one another, linings taped and caulked ready for the decorator.

Balustrade and floor, landing

Carpentry · Flooring

Balustrade and floor, landing

Newels, handrail and spindles fitted to the landing, then the floor laid up to the strings so nothing had to be scribed twice.

Something like one of these?

Every job is quoted on what I find in the room. Ring during the day or send the form and I will come back the same evening.