Recent work
Photographs from my own phone, taken as the job went along. Most of them are the middle of the work rather than the tidy end of it, because the middle is the part you are paying for and the part nobody else shows you.

Loft conversion, framed and boarded
Two weeks of framing under the rafters and then boarding out. The gable was blockwork on one side and old brick on the other, so the linings were packed out to meet in a single flat plane rather than following what was there.
Timber studwork · insulated · boarded and taped
4 photographs

Curved bar counter, commercial fit-out
Framed and clad in a long continuous curve, then tiled. The radius was set out full size on the floor first, so the front came round in one line instead of a series of flats pretending to be a curve.
Curved carcass · tiled front · worktop to follow
5 photographs

Door sets with vision panels
Sets hung and vision panels fitted square to one another, linings taped and caulked ready for the decorator.

Balustrade and floor, landing
Newels, handrail and spindles fitted to the landing, then the floor laid up to the strings so nothing had to be scribed twice.
Something like one of these?
Every job is quoted on what I find in the room. Ring during the day or send the form and I will come back the same evening.